SEISMOLOGY AND GEOLOGY ›› 1998, Vol. 20 ›› Issue (2): 110-112.
• Brief Report • Previous Articles Next Articles
Zhu Qingzhong, Gu Yuanzhu, Liu Chenlong
Received:
Revised:
Online:
Published:
朱清钟, 谷元珠, 刘成龙
基金资助:
Abstract: Before the Zhangbei Shangyi earthquake,obvious middle and short term and impending anomalies of water level and water temperature appeared in the Tayuan and Taipingzhuang well.Based on these anomalies in cambination with other precursars,we have proposed short term and impending prediction to a certain extent.
Key words: Well water level, Aanomaly, Earthquake prediction
摘要: 张北-尚义地震前塔院、太平庄两井的水位、水温出现明显的中短期异常和短临异常。笔者利用这些异常并结合其它测项的异常,震前曾提出了一定的短临预报意见。
关键词: 井水水位, 异常, 地震预报
Zhu Qingzhong, Gu Yuanzhu, Liu Chenlong . PHYSICAL ANOMALIES OF GROUNDWATER AND SHORT TERM AND IMPENDING PREDICTION BEFORE THE ZHANGBEISHANGYI EARTHQUAKE[J]. SEISMOLOGY AND GEOLOGY, 1998, 20(2): 110-112.
朱清钟, 谷元珠, 刘成龙. 张北-尚义地震前地下水物理动态异常与短临预报[J]. 地震地质, 1998, 20(2): 110-112.
Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.dzdz.ac.cn/EN/
https://www.dzdz.ac.cn/EN/Y1998/V20/I2/110