SEISMOLOGY AND GEOLOGY ›› 2020, Vol. 42 ›› Issue (2): 492-512.DOI: 10.3969/j.issn.0253-4967.2020.02.015
Previous Articles Next Articles
WU Wei-wei, WEI Ya-ling, LONG Feng, LIANG Ming-jian, CHEN Xue-fen, SUN Wei, ZHAO Jing
Received:2019-10-09
Online:2020-04-20
Published:2020-07-13
吴微微, 魏娅玲, 龙锋, 梁明剑, 陈学芬, 孙玮, 赵晶
作者简介:吴微微, 女, 1982年生, 2009年于中国地震局地球物理研究所获地球探测与信息技术专业硕士学位, 高级工程师, 主要从事地震监测预报、 数字地震学应用等方面的研究工作, 电话: 13882255716, E-mail: wuweiwei06@mails.gucas.ac.cn。
基金资助:CLC Number:
WU Wei-wei, WEI Ya-ling, LONG Feng, LIANG Ming-jian, CHEN Xue-fen, SUN Wei, ZHAO Jing. STUDY ON SOURCE PARAMETERS OF THE 8 AUGUST 2017 M7.0 JIUZHAIGOU EARTHQUAKE AND ITS AFTERSHOCKS, NORTHERN SICHUAN[J]. SEISMOLOGY AND GEOLOGY, 2020, 42(2): 492-512.
吴微微, 魏娅玲, 龙锋, 梁明剑, 陈学芬, 孙玮, 赵晶. 2017年8月8日四川九寨沟M7.0地震及其余震序列的震源参数[J]. 地震地质, 2020, 42(2): 492-512.
Add to citation manager EndNote|Ris|BibTeX
URL: https://www.dzdz.ac.cn/EN/10.3969/j.issn.0253-4967.2020.02.015
| [1] 程佳, 姚生海, 刘杰, 等. 2018. 2017年九寨沟地震所受历史地震黏弹性库仑应力作用及其后续对周边断层地震危险性的影响[J]. 地球物理学报, 61(5): 2133—2151. CHENG Jia, YAO Sheng-hai, LIU Jie, [2] 邓起东, 高翔, 陈桂华, 等. 2010. 青藏高原昆仑-汶川地震系列与巴颜喀喇断块的最新活动[J]. 地学前缘, 17(5): 163—178. DENG Qi-dong, GAO Xiang, CHEN Gui-hua, [3] 房立华, 吴建平, 苏金蓉, 等. 2018. 四川九寨沟MS7.0地震主震及其余震序列精定位[J]. 科学通报, 63(7): 649—662. FANG Li-hua, WU Jian-ping, SU Jin-rong, [4] 房立华, 吴建平, 王未来, 等. 2013. 四川芦山MS7.0地震及其余震序列重定位[J]. 科学通报, 58(20): 1901—1909. FANG Li-hua, WU Jian-ping, WANG Wei-lai, [5] 高翔, 邓起东. 2013. 巴颜喀拉断块边界断裂强震活动分析[J]. 地质学报, 87(1): 9—19. GAO Xiang, DENG Qi-dong.2013. Activity analysis of large earthquakes in boundary faults around the Bayankala faulting block[J]. Acta Geologica Sinica, 87(1): 9—19(in Chinese). [6] 侯康明, 闻学泽. 1999. 板内逆断层地震破裂的基本特征及分段标志研究[J]. 西北地震学报, 21(3): 302—309. HOU Kang-ming, WEN Xue-ze.1999. Earthquake rupture characteristics of intraplate reverse fault and signs of fault segmentation[J]. Northwestern Seismological Journal, 21(3): 302—309(in Chinese). [7] 黄媛, 吴建平, 张天中, 等. 2008. 汶川8.0级大地震及其余震序列重定位研究[J]. 中国科学(D辑), 38(10): 1242—1249. HUANG Yuan, WU Jian-ping, ZHANG Tian-zhong, [8] 林向东, 葛洪魁, 徐平, 等. 2013. 近场全波形反演: 芦山7. 0级地震及余震矩张量解[J]. 地球物理学报, 56(12): 4037—4047. LIN Xiang-dong, GE Hong-kui, XU Ping, [9] 鲁人齐, 徐锡伟, 陈立春, 等. 2018. 2017年8月8日九寨沟MS7.0地震构造与震区三维断层初始模型[J]. 地震地质, 40(1): 1—11. doi: 10.3969/j.issn.0253-4967.2018.01.00. LU Ren-qi, XU Xi-wei, CHEN Li-chun, [10] 罗江. 1978. 中华人民共和国区域地质调查报告, 1︰200000 漳腊幅 [R]. 北京: 中国地质图制印厂. LUO Jiang.1978. Regional geological survey report of the People's Republic of China, 1︰200000: Zhangla Sheet [R]. China Geological Map Printing Factory, Beijing(in Chinese). [11] 单新建, 屈春燕, 龚文瑜, 等. 2017. 2017年8月8日四川九寨沟7.0级地震InSAR同震形变场及断层滑动分布反演[J]. 地球物理学报, 60(12): 4527—4536. SHAN Xin-jian, QU Chun-yan, GONG Wen-yu, [12] 王椿镛, 吴建平, 楼海, 等. 2003. 川西藏东地区的地壳P波速度结构[J]. 中国科学(D辑), 33(S1): 181—189. WANG Chun-yong, WU Jian-ping, LOU Hai, [13] 闻学泽, 杜方, 张培震, 等. 2011. 巴颜喀拉块体北和东边界大地震序列的关联性与2008年汶川地震[J]. 地球物理学报, 54(3): 706—716. WEN Xue-ze, DU Fang, ZHANG Pei-zhen, [14] 温燕林, 宋治平, 赵文舟, 等. 2015. 东昆仑断裂带玛曲—玛沁段大震危险性分析和探讨[J]. 地震工程学报, 37(1): 175—180. WEN Yan-lin, SONG Zhi-ping, ZHAO Wen-zhou, [15] 吴建平, 黄媛, 张天中, 等. 2009. 汶川MS8.0地震余震分布及周边区域P波三维速度结构研究[J]. 地球物理学报, 52(2): 320—328. WU Jian-ping, HUANG Yuan, ZHANG Tian-zhong, [16] 吴微微, 苏金蓉, 魏娅玲, 等. 2016. 四川地区介质衰减、 场地响应与震级测定的讨论[J]. 地震地质, 38(4): 1005—1018. doi: 10.3969/j.issn.0253-4967.2016.04.01. WU Wei-wei, SU Jin-rong, WEI Ya-ling, [17] 徐锡伟, 陈桂华, 王启欣, 等. 2017a. 九寨沟地震发震断层属性及青藏高原东南缘现今应变状态讨论[J]. 地球物理学报, 60(10): 4018—4026. XU Xi-wei, CHEN Gui-hua, WANG Qi-xin, [18] 徐锡伟, 韩竹军, 杨晓平, 等. 2016. 中国及邻区地震构造图 [CM]. 北京: 地震出版社. XU Xi-wei, HAN Zhu-jun, YANG Xiao-ping, [19] 徐锡伟, 吴熙彦, 于贵华, 等. 2017b. 中国大陆高震级地震危险区判定的地震地质学标志及其应用[J]. 地震地质, 39(2): 219—275. doi: 10.3969/j.issn.0253-4967.2017.02.001. XU Xi-wei, WU Xi-yan, YU Gui-hua, [20] 杨宜海, 范军, 花茜, 等. 2017. 近震全波形反演2017年九寨沟M7.0地震序列震源机制解[J]. 地球物理学报, 60(10): 4098—4104. YANG Yi-hai, FAN Jun, HUA Qian, [21] 杨智娴, 陈运泰, 郑月军, 等. 2003. 双差地震定位法在中国中西部地区地震精确定位中的应用[J]. 中国科学(D辑), 33(S1): 129—134. YANG Zhi-xian, CHEN Yun-tai, ZHENG Yue-jun, [22] 易桂喜, 龙锋, 梁明剑, 等. 2017. 2017年8月8日九寨沟M7.0地震及余震震源机制解与发震构造分析[J]. 地球物理学报, 60(10): 4083—4097. YI Gui-xi, LONG Feng, LIANG Ming-jian, [23] 张旭, 冯万鹏, 许力生, 等. 2017. 2017年九寨沟MS7.0地震震源过程反演与烈度估计[J]. 地球物理学报, 60(10): 4105—4116. ZHANG Xu, FENG Wan-peng, XU Li-sheng, [24] 赵珠, 范军, 郑斯华, 等. 1997. 龙门山推覆构造带地壳速度结构和震源位置的精确修定[J]. 地震学报, 19(6): 615—622. ZHAO Zhu, FAN Jun, ZHENG Si-hua, [25] 郑勇, 马宏生, 吕坚, 等. 2009. 汶川地震强余震(MS≥5.6)的震源机制解及其与发震构造的关系[J]. 中国科学(D辑), 39(4): 413—426. ZHENG Yong, MA Hong-sheng, LÜ Jian, [26] 朱介寿, 曹家敏, 刘舜化, 等. 1984. 用人工地震初探川西地区的地壳结构[J]. 成都地质学院学报, (3): 111—122. ZHU Jie-shou, CAO Jia-min, LIU Shun-hua, [27] Brune J N.1970. Tectonic stress and the spectrum of seismic shear waves from earthquakes[J]. Journal of Geophysical Research, 75(26): 4997—5009. [28] Gan W J, Zhang P Z, Shen Z K, [29] Jones L M, Han W, Hauksson E, [30] Long F, Yi G, Wang S, [31] Pasyanos M E, Dreger D S, Romanowicz B.1996. Towards real-time estimation of regional moment tensors[J]. Bulletin of the Seismological Society of America, 86(5): 1255—1269. [32] Riaz M S, Zheng Y, Liu F, [33] Shen Z K, Lü J N, Wang M, [34] Sun J, Yue H, Shen Z, [35] Tan Y, Zhu L P, Helmberger D V, [36] Waldhauser F, Ellsworth L W.2000. A double-difference earthquake location algorithm: Method and application to the northern Hayward Fault[J]. Bulletin of the Seismological Society of America, 90(6): 1353—1368. [37] Wu Y Q, Jiang Z S, Zhao J, [38] Zhao L S, Helmberger D V.1994. Source estimation from broadband regional seismograms[J]. Bulletin of the Seismological Society of America, 84(1): 91—104. [39] Zhu L P, Helmberger D V.1996. Advancement in source estimation techniques using broadband regional seismograms[J]. Bulletin of the Seismological Society of America, 86(5): 1634—1641. [40] Zoback M L.1992. First- and second-order patterns of stress in the lithosphere: The world stress map project[J]. Journal of Geophysical Research, 97(B8): 11703—11728. |
| [1] | LI Zi-hong, ZHUO Yan-qun, CHEN Shun-yun, CHEN Hao, LU Li-li. EXPERIMENTAL STUDY ON THE EFFECTS OF FAULT CONTACT HETEROGENEITY ON SEISMIC ACTIVITY [J]. SEISMOLOGY AND GEOLOGY, 2026, 48(2): 329-350. |
| [2] | LI Yan, CHEN Jun-lei, LÜ Si-yu, WANG Yu-dong, FU Lei. THE STRESS FIELD INVERSION AND TRIGGER RELATIONSHIPS OF THE JINGGU EARTHQUAKE SEQUENCE [J]. SEISMOLOGY AND GEOLOGY, 2026, 48(2): 561-581. |
| [3] | WANG Xia, SONG Mei-qing, WU Hao-yu, LIANG Xiang-jun, LÜ Rui, GUO Wen-feng, ZHANG Na, LI Jin. STRESS FIELD IN SHANXI RIFT AND ITS DYNAMIC SIGNIFICANCE [J]. SEISMOLOGY AND GEOLOGY, 2026, 48(1): 257-277. |
| [4] | ZHANG Bo, WANG Ai-guo, FENG Zi-wei, HE Xiao-long, ZHU Jun-wen, YAO Yun-sheng, CAI Yi-meng. SEIMOTECTONIC ANALYSIS OF 2023 JISHISHAN MS6.2 EARTHQUAKE IN GANSU PROVINCE [J]. SEISMOLOGY AND GEOLOGY, 2025, 47(6): 1586-1605. |
| [5] | DAI Zong-hui, QU Jun-hao, XU Ning, LI Cui-qin, LI Dong-mei, YIN Yu-zhen. THREE-DIMENSIONAL WAVE VELOCITY STRUCTURE AND SEISMOGENIC STRUCTURE FOR THE 2023 WEISHAN EARTHQUAKE SWARM [J]. SEISMOLOGY AND GEOLOGY, 2025, 47(6): 1649-1666. |
| [6] | LI Ting-ting, MIAO Fa-jun, SUN Ye-jun, FAN Wen-hua, GONG Jie, GU Qin-ping, DU Hang, SUN Xiao-hang, ZHANG Cen, LI Zi-ye. THREE-DIMENSIONAL WAVE VELOCITY STRUCTURE AND SEISMOGENIC STRUCTURE FOR THE JIANGDU EARTHQUAKE SWARM IN JIANGSU [J]. SEISMOLOGY AND GEOLOGY, 2025, 47(5): 1343-1363. |
| [7] | LI Lin-lin, JIANG Wen-liang, LI De-wen, JIAO Qi-song, LUO Yi, LI Yong-sheng, TIAN Yun-feng, LI Ying-ying. SURFACE RUPTURE CHARACTERISTICS OF THE JISHISHAN MS6.2 EARTHQUAKE ON DECEMBER 18, 2023 [J]. SEISMOLOGY AND GEOLOGY, 2025, 47(4): 1058-1074. |
| [8] | GONG Meng, ZOU Xian-kun, WANG Xiao-shan, LI Guang, SHENG Shu-zhong, LI Hong-xing, XU Rong-hua, LU Chang-sheng. SIMULTANEOUS INVERSION OF CRUSTAL VELOCITY STRUCTURE AND EARTHQUAKE RELOCATION IN THE NORTHWEST OF THE BEIJING AREA [J]. SEISMOLOGY AND GEOLOGY, 2025, 47(4): 1132-1151. |
| [9] | ZHOU Ben-wei, FANG Li-hua, ZHANG Li-fen, WANG Jie, WANG Shi-guang, LIU Hua-biao. CONSTRUCTION OF A COMPLETE EARTHQUAKE CATALOG OF THE THREE GORGES SEISMIC NETWORK USING PALM AND THE GENESIS MECHANISM OF THE BADONG EARTHQUAKE SWARM FROM 2017 TO 2018 [J]. SEISMOLOGY AND GEOLOGY, 2025, 47(4): 1152-1166. |
| [10] | TANG Mao-yun, LI Cui-ping, HUANG Shi-yuan, DONG Lei, GAO Jian, LI Yong. THE CHARACTERISTICS OF TECTONIC STRESS FIELD AND SPATIOTEMPORAL EVOLUTION OF SEISMIC ACTIVITY IN LUXIAN-RONGCHANG [J]. SEISMOLOGY AND GEOLOGY, 2025, 47(4): 1183-1203. |
| [11] | DONG Chun-li, GUO Wen-feng, LIU Rui-chun, DING Da-ye. STRESS CHARACTERISTICS AND SEISMIC ACTIVITY CORRE-LATION OF SMALL TO MEDIUM EARTHQUAKE SOURCE MECHANISMS IN THE CENTRAL AND SOUTHERN PART OF SHANXI PROVINCE [J]. SEISMOLOGY AND GEOLOGY, 2025, 47(4): 1222-1243. |
| [12] | GUO Zhao-wu, LU Ren-qi, ZHANG Jin-yu, FANG Li-hua, LIU Guan-shen, WU Xi-yan, SUN Xiao, QI Shi-miao. THREE-DIMENSIONAL MODEL OF SEISMOGENIC FAULT AND SEISMIC ENVIRONMENT OF XIZANG DINGRI MS6.8 EARTHQUAKE OF JANUARY 7, 2025 [J]. SEISMOLOGY AND GEOLOGY, 2025, 47(3): 671-688. |
| [13] | XU Yue-yi, XU Bei-bei, XU Chen-yu, SHAO Zhi-gang, HU Chao-zhong. JOINT INVERSION OF THE 2025 DINGRI MS6.8 EARTHQUAKE RUPTURE PROCESS BASED ON TELESEISMIC P WAVES, STRONG-MOTION AND INSAR DATA [J]. SEISMOLOGY AND GEOLOGY, 2025, 47(3): 734-746. |
| [14] | CHEN Han-lin, WANG Qin-cai, GAO Jin-rui, LI Jun. PRELIMINARY STUDY ON THE SEISMOGENIC STRUCTURE OF THE 2025 XIZANG DINGRI MS6.8 EARTHQUAKE SEQUENCE [J]. SEISMOLOGY AND GEOLOGY, 2025, 47(3): 747-760. |
| [15] | YIN Xin-xin, ZUO Ke-zhen, ZHAO Cui-ping, CAI Run. RELOCATION AND FORESHOCK SEQUENCE IDENTIFICATION OF DINGRI MS6.8 EARTHQUAKE IN XIZANG [J]. SEISMOLOGY AND GEOLOGY, 2025, 47(3): 850-868. |
| Viewed | ||||||
|
Full text |
|
|||||
|
Abstract |
|
|||||